News Flash

Engineering

Posted on: January 21, 2019

Brand Road Chosen for Sustainable Design Upgrades

Location

President George Bush Turnpike (PGBT) to Muirfield Road

Brand Road will take on a new look in the near future. This section of Brand Road is part of the 2004 bond program and was selected for sustainable design. With the ample ROW and need for traffic management, this corridor was well-suited for sustainable design. 

Project Details

The project will include median landscaping to maintain the aesthetics, roundabouts to manage the speed of vehicles, and bioswales to filter stormwater runoff within the ROW. The renderings show the overall appearance of the proposed alignment.

Facebook Twitter Email